commercial. residential. service. special hazards.

2020 Completed Projects

BWC TERMINALS
8 Deluge Foam Systems
6 Foam Chambers
90+ Foam Nozzles
3 Mobile Foam Hand line Carts
2 Foam Bladder Tanks
Pre-Manufactured Fire Pump
IMFP completed this project from initial inception and concept drawings to commissioning. An Excellent display of Iron Mountain Fire Protections Capabilities!
GOOD SAM HELI-PAD
Active Emergency Helicopter Landing Pad
Coordination with FAA and Hospital for shutdown
Hose Reel Skid with Bladder tank
Modification of Existing Sprinkler System and piping to accommodate new installation of Skid Unit
Demo and Removal of old foam equipment
Full testing and commissioning
IMFP completed this project within two shutdown timeframes to minimize impacts to the Hospital. A key example of speed and efficiency.


MILITARY HANGAR
Full design performed in house
Modification to existing system, including removal of old equipment and updating to current UFC code standards
Foam Generator Relocations
Deluge valve replacement
Inductor installation
Atmospheric Tank conversion
Full testing and commissioning
This was an extensive project spanning multiple years. Project was complicated due to multiple trades within tight existing spaces. 3D modeling and BIM coordination helped IMFP succeed where others failed.
Project passed both PAT and FAT on first attempts!